- Check Communication Cables
 Level of Difficulty - MEDIUM  Estimated Completion Time - 30 minutes
TASKI - SWINGO 750B

Tools Required
Tool 
Torx T20
Torx T25
Wrench-Allen metric 6.0mm

Parts Required


Step Procedure & Parts & Tools
1 LOCATE THE CHARGER PLUG ON THE BACK OF THE MACHINE AND PULL TO DISCONNECT IT

2 TURN THE KEY OFF AND REMOVE THE 5 SCREWS FROM THE CONTROL PANEL
Torx T25

3 PULL THE CONTROL PANEL OUT TO LOCATE THE COMMUNICATION CABLE

4 TURN SCREWS BY HAND TO MAKE SURE THE CONNECTION IS TIGHT. INSPECT CABLE FOR CUTS OR WEAR.

5 LOCATE THE DRAIN HOSES ON THE BACK OF THE MACHINE

6 PULL TO REMOVE THE BLUE CAPPED HOSE FROM MACHINE. PLACE HOSE NEAR DRAIN AND REMOVE CAP

7 PULL TO REMOVE THE RED CAPPED HOSE FROM MACHINE. PLACE HOSE NEAR DRAIN AND REMOVE CAP

8 REMOVE THE 2 TANK BOLTS ON EACH SIDE OF THE MACHINE. THESE BOLTS ARE LOCATED AT THE FRONT OF THE MACHINE AT THE BASE.
Wrench-Allen metric 6.0mm

9 LIFT THE TANK TO OPEN THE MACHINE

10 REMOVE THE 2 SCREWS HOLDING THE CONTROL BOARD COVER
Torx T20

11 PULL UP ON THE CONTROL BOARD COVER TO REMOVE IT FROM THE MACHINE

12 LOCATE THE END OF THE COMMUNICATION CABLE THATS ATTACHED TO THE CONTROL BOARD. TURN SCREWS BY HAND TO MAKE SURE THE CONNECTION IS TIGHT. INSPECT CABLE FOR CUTS OR WEAR.